NHAIS HA/GP Links - PCRM GP Links Requirements for Adaptor Implementation

ID

RM253

Version

1.0.0

Type

Roadmap Item

Contracting Vehicle(s)

Title

NHAIS HA/GP Links - PCRM GP Links Requirements for Adaptor Implementation

Description

Update to PCRM GP Links Requirements with associated guidance for Adaptor Implementation.

Date Added

Jan 10, 2025

Standards and Capabilities

NHAIS HA/GP Links

Change Route

Managed Capacity - Minor/Patch uplifts

Change Type

Uplift

Status

Draft

Publication Date

Jan 24, 2025

Effective Date

Feb 7, 2025

Incentives / Funding

No

Incentive / Funding Dates

N/A

Background

An update is required to include requirements along with associated guidance notes to enable new GP Foundation Solutions to connect and onboard with the PCRM API endpoint, when accessing the end point using NHAIS/PCRM GP Links pre-assured Adaptor.

Outline Plan

N/A

Summary of Change

NHAIS HA/GP links: Requirement NH06 updated

NH06

If implementing NHAIS HA/GP Links using the NHAIS GP Links adaptor:Ā 

The adaptor provides a pre-assured implementation of theĀ NHAIS/GP LinksĀ Standard and covers the requirements below.

MUST

Full Specification

The updated NHAIS HA/GP Links Standard will be added at a later date. Proposed changes can be viewed in the Summary of Change above.

Assurance Approach

Existing NHAIS HA/GP Links Adaptor Assurance will apply.