NHAIS HA/GP Links - PCRM GP Links Requirements for Adaptor Implementation
ID | RM253 |
---|---|
Version | 1.0.0 |
Type | Roadmap Item |
Contracting Vehicle(s) |
Title | NHAIS HA/GP Links - PCRM GP Links Requirements for Adaptor Implementation |
---|---|
Description | Update to PCRM GP Links Requirements with associated guidance for Adaptor Implementation. |
Date Added | Jan 10, 2025 |
Standards and Capabilities | |
Change Route | Managed Capacity - Minor/Patch uplifts |
Change Type | Uplift |
Status | Draft |
Publication Date | Jan 24, 2025 |
Effective Date | Feb 7, 2025 |
Incentives / Funding | No |
Incentive / Funding Dates | N/A |
Background
An update is required to include requirements along with associated guidance notes to enable new GP Foundation Solutions to connect and onboard with the PCRM API endpoint, when accessing the end point using NHAIS/PCRM GP Links pre-assured Adaptor.
Outline Plan
N/A
Summary of Change
NHAIS HA/GP links: Requirement NH06 updated | ||
NH06 | If implementing NHAIS HA/GP Links using the NHAIS GP Links adaptor:Ā
The adaptor provides a pre-assured implementation of theĀ NHAIS/GP LinksĀ Standard and covers the requirements below. | MUST |
Full Specification
The updated NHAIS HA/GP Links Standard will be added at a later date. Proposed changes can be viewed in the Summary of Change above.
Assurance Approach
Existing NHAIS HA/GP Links Adaptor Assurance will apply.